What has to move for everything else to move?
Find the rate-limiting step
Do not optimise everything. Find what is limiting the system now, and put the weight there.
- physics
- architecture
- yield
- a missing engineer
- a test rig
- tooling
- certification
- a supplier
- a customer
- production capacity
- working capital